QuranFlow Admin

Team updates

Rolling log of v2 / v2.1 admin-redesign updates — walkthrough recaps, process explainers, decision summaries, and loop-completion writeups. Newest at the top. The live mockup lives at quranflow-admin.pages.dev/v2.

Latest

2026-05-26 Production handover

Production handover ready — Granjur kickoff package

Six days since the May 20 meeting asks, the production bundle is shipped. New repo at almaghrib-engineering/quranflow-admin, onboarding mini-site live at quranflow-admin-onboarding.pages.dev, backend host decided (DigitalOcean nyc per ADR-019), four GitHub issue templates routing every spec question to Kamran + Lejla by default.

Handover bundle ADR-019 · DigitalOcean 4 issue templates Kamran + Lejla routing

Earlier

2026-05-20

Meeting asks — 5 open questions

The 5 standalone decisions to discuss in the meeting — Lejla (2 questions: Past Due display, Scholarship thresholds) and Usama (3 questions: Family Plans coupon strategy, Legacy coupon shape BLOCKING, billing_alerts schema). Each card has a recommended default for what ships if no input is given.

5 questions Lejla · Usama 1 BLOCKING
2026-05-18

v2.1 — what we decided since

Wrap-up of the post-Phase-D 21-cycle decision loop. 11 ADRs landed, 3 Granjur handover packets prepared, 45 Billing items resolved internally, Week-0 pre-flight checklist + final mockup audit shipped. The 5 meeting questions live on their own page (see Latest).

21 cycles 11 ADRs Production-ready
2026-05-16

v2.1 — what we redesigned and what's next

One-page tour of the v2.1 pass — what got reviewed in the advanced 4-phase pipeline, what shipped in the mockup, and the 45 schema open questions remaining before production handoff.

v2.1 overview Phase A-D pipeline Schema gates
2026-05-15

How the v2.1 pre-review pipeline works

Process explainer — how the 4-phase advanced review (raw audit → depth investigation → decision packages → implementation) coordinates agent teams to produce production-ready output.

Process Agent teams 4 phases
2026-05-14

Scheduling walkthrough — decisions & impact

Recap of the May 14 Scheduling deep-dive: S1-S12 decisions captured with rationale for the rejected ones, mockup screenshots, and the S6 merge that shipped to main the same day.

Walkthrough 12 decisions Scheduling domain